Announcements
University Announcements from the Director of Operations
Communications Announcement
Purdue University - Physical Facilities
TO: Building Deputies [Please distribute.]
FR: Physical Facilities
DA: Tuesday, August 26, 2008
RE: Young Hall Front Entrance
Drive Closure: Wood St. Parking Garage Update
- Effective Wednesday, August 27 and Thursday, August 28, the Young Hall front
entrance drive and parking spaces (under the canopy - east side of
building) will be closed due to a lift occupying the drive. Small barricades
will be positioned to route foot traffic around the lift. A map of the area is available here: http://www.purdue.edu/physicalfacilities/travel/pdf/Young_Hall_drive.pdf
- Levels 1-7 of the Wood Street Parking Garage will be open the remainder
of this week. The garage will be closed during the weekend and Monday
(Saturday, August 30 - Monday, September 1). All levels of the garage will reopen
Tuesday, September 2. We apologize for any inconvenience this disruption has caused.
Communications Announcement
Purdue University - Physical Facilities
TO: Building Deputies [Please distribute.]
FR: Physical Facilities
DA: Thursday, August 7, 2008
RE: Campus Disruptions Update
- Wastewater
personnel will be making a sewer repair today on the east side of University Street
in the turn lane to Elliott Hall (across from the University
Street Parking Garage). A portion of the turn lane will be closed.
- Effective Monday,August
11 through Wednesday, August 13 (weather permitting), the
sidewalk and parking spaces will not be available on the west side of S. University Street between Agricultural and
Biological Engineering and State Street. A map of the area is available here:
http://www.purdue.edu/physicalfacilities/travel/pdf/s_university_to_state.pdf
- Effective Thursday,
August 14 and Friday, August 15, a ramp will be placed across University Street
just north of Stadium Avenue
(between Cary Quadrangle and Lambert Fieldhouse. Crews will be working on a
sewer project. A large VAC truck and other vehicles will be on sight.
- First Street, from McArthur Drive to the west entrance of the parking
lot at Fowler House, will reopen Monday, August 11, 2008. A map of the area is available here: http://www.purdue.edu/physicalfacilities/travel/pdf/RSH.pdf
Project Updates:
- The Marsteller
Street Parking Garage will be cleaned beginning Sunday, August 10, 2008. Building
Services will clean the building from 10:30 p.m. to 7:00 a.m. All vehicles must
vacate the garages during the cleaning period.
- The Wood Street Garage will be open before the start of classes. Some
closures will continue until September 24. Odor from the construction work is
expected. In addition, one of the three stair towers may be closed at
times.
- Stadium Mall Drive is closed until August 29, 2008, for
the Stadium Mall Gateway project. Pedestrians will not be able to walk on the
main drive at the northwest end of the Mall, although the sidewalks will remain
open. Vehicles will only be able to access the Mall from the south, and the
west entrance of Armstrong will be inaccessible to vehicles.
- Parking and
traffic patterns are disrupted until project completion (June 2009),
near the Purdue Airport due to construction of
the Niswonger Aviation Technology addition.
- Until August
15 please use caution while walking between Armstrong and Civil as crews in
man lifts work on a masonry restoration project on the exterior of Civil. The
work site will be fenced and all walkways will remain open.
Communications Announcement
Purdue University - Physical Facilities
TO: Building Deputies [Please distribute.]
FR: Physical Facilities
DA: Thursday, July 3, 2008
RE: Campus Disruptions Update
- Nimitz Dr.
between Jischke Dr.
and Gates Dr. is expected to reopen by Friday, July 4.
- The drive north of ENAD will be closed Monday, July 7, 2008, for two weeks.
- Effective now through the end of the month, the sidewalk on the east side of Gates Road is
closed from Nimitz to the gravel parking lot to the west of the Purdue Police
Department. The gravel parking lot (A lot) on the west end of the Purdue Police
Department has closed for construction. The lot is estimated to reopen in late
August. A map of the area is available here: http://www.purdue.edu/physicalfacilities/pdf/tery.pdf
Communications Announcement
Purdue University - Physical Facilities
TO: Building Deputies [Please distribute.]
FR: Physical Facilities
DA: Friday, June 6, 2008
RE: Construction Projects Update
- The anticipated project start date for the South Russell Drive closure between Harrison Street and
the KB&S railroad is July
7, 2008.
- Sidewalks will be repaired and replaced on the west side curb of S. Sheetz Street
from Harrison to Steely. This project is
expected to take place from June
9-13, 2008.
- Effective Monday, June 9
through Monday, June 13, the sidewalk and parking spaces will
not be available on the west side of S.
University Street between the Hansen Life Science
Research Building and State Street.
(This project was originally scheduled for last week.)
A map of the area is available here: http://www.purdue.edu/physicalfacilities/travel/pdf/s_university_to_state.pdf
- The Tippecanoe County Highway
has not yet closed Stadium Avenue
at the bridge just west of David
Ross Road to replace the bridge. This area is
tentatively scheduled for closure on Monday,
July 7, 2008. A map of the area is available here: http://www.purdue.edu/physicalfacilities/travel/pdf/Tippi_Bridge_Stadium.pdf
- No
parking is available just north of Harrison Hall. The parking area has been
converted to a plaza and will no longer be available for parking or thru
traffic.
- Reminder of Summer
Garage Cleaning Schedule:The following is the summer garage cleaning schedule. Building Services
will clean the buildings from 10:30 p.m. to 7:00 a.m. All vehicles must vacate
the garages during the cleaning period from 10:30 p.m. - 7:00 a.m.June 1 – June 10 ..........Grant Street Garage
June 11 – June 19 ....... University Street Garage (north half)
June 22 – July 3 ........... University Street Garage (south half)
July 6 – July 18 ............. Northwestern Street Garage (north half)
July 20 – July 29 ........... Northwestern Street Garage (south half)
July 30 – August 3 ........ Marsteller
Street Garage
Note:
• The Grant Street Garage will remain open. It will be cleaned one half
at a time starting with the top three levels.
• The Wood Street Garage will be closed all summer for major repairs and
cleaned by the contractor.
• The Marsteller Garage also will have repair work throughout the summer.
Communications Announcement
Purdue University - Physical Facilities
TO: Building Deputies [Please distribute.]
FR: Physical Facilities
DA: Friday, May 9, 2008
RE: Construction Projects Update
- The South Russell Drive
closure between Harrison Street
and the KB&S railroad tracks is now anticipated to begin on or after May 19. The planned
start date had been set for May 12. A map of the area is available here: http://www.purdue.edu/physicalfacilities/travel/pdf/S.Russell_RR.pdf
- Beginning May 12 through August 1 please use caution while walking between
Armstrong and Civil as crews in a man lift work on a masonry restoration
project on the exterior of Civil. The work site will be fenced and all walkways
will remain open.
- The sidewalk on University Street
west of Mathews Hall will be closed beginning May
12 through August 11.
Communications
Announcement
Purdue University - Physical Facilities
TO: Building Deputies [Please distribute.]
FR: Physical Facilities
DA: Monday, May 5, 2008
RE: Major Campus Construction Disruptions to begin on or after May 12
The following are major construction disruptions that will begin on or after
Monday, May 12, 2008. Please be alert as you travel and please be patient as
staff and contractors work to complete the projects prior to the start of the
fall semester. A number of additional construction projects will be in progress
as well.
- South Russell Drive
will be closed for reconstruction between Harrison Street and the KB&S railroad
tracks to the south. Construction traffic, customers, and staff are asked to
use Ahlers Road
from S. River Road
for access to campus buildings south of the railroad tracks. A map of the area is available here: http://www.purdue.edu/physicalfacilities/travel/pdf/S.Russell_RR.pdf
- First Street
between Jischke Drive
and Russell Drive
will be closed until August, 2009 for the Duhme Hall Remodel Project. The
Windsor Woods parking loop will not be available for thru traffic. A map of the area is available here: http://www.purdue.edu/physicalfacilities/travel/pdf/Dumhe_Hall.pdf
- First Street,
from McArthur Drive
to the west entrance of the parking lot at Fowler House, will close once again
for utility work until July, 2009 for the Replacement Student Housing Project. A map of the area is available here: http://www.purdue.edu/physicalfacilities/travel/pdf/RSH.pdf
- Traffic will be realigned along Harrison
Street from Jischke Drive to Russell Drive for the start of the Harrison Street
high voltage duct bank project. During construction additional streets will
close for periods of time. These areas include:
A. Harrison Street
crossing at Transportation
B. Jischke Dr.
just north of Harrison Street
C. Nimitz Dr.
between Jischke Dr.
and Gates Dr.
D. Gates Dr. south
of Nimitz Dr.
to the Discovery Parking lot
E. Arnold Drive.
South of Nimitz Dr.
A map of the area is available here: http://www.purdue.edu/physicalfacilities/travel/pdf/Harrison_St._High_Voltage.pdf
- A tunnel top replacement project will take place immediately south of State Street on S. Russell Drive.
The closure is from State St.
to just before the entrance into the Lilly parking lot on the east side of the
S. Russell and to the entrance into the Poultry building parking lot. Both
parking lots will be available from the south side of the closure. A map of the area is available here: http://www.purdue.edu/physicalfacilities/travel/pdf/Tunnel_Top_S.Russell.pdf
- The Tippecanoe County Highway
will close Stadium Avenue
at the bridge just west of David
Ross Road to replace the bridge. A map of the area is available here: http://www.purdue.edu/physicalfacilities/travel/pdf/Tippi_Bridge_Stadium.pdf
- In addition:
The Indiana Department of Transportation plans to repave various locations on
campus beginning May 12 through June 30. Locations include:
1. North University St.
from Stadium Ave.
to Tower Drive
2. Ade Drive starting at Tower
Drive
3. Tower Drive
from University St.
to N. Intramural Drive
4. N. Intramural Drive from SR 26 to 3rd Street
5. Beering Drive
from Tower Drive
to Stadium Ave.
6. Horticulture Drive
from Harrison St.
to one drive north of Harrison St.
7. Drive to Daniels turf farm on SR 126
- The Pedestrian Traffic Impact Map for summer 2008 is available at http://www.purdue.edu/physicalfacilities/campusconstruction/. This website displays the construction projects around campus that will affect
pedestrian and vehicular traffic throughout the summer. Click on the colored
and numbered sites for the individual project's location, construction dates,
and related information. (Pop-ups must be enabled to use this feature.) If you have questions about the map, please contact: Stephanie Boland, Physical
Facilities Communications Coordinator at seboland@purdue.edu
or 4-6916.
Communications Announcement
Purdue University - Physical Facilities
TO: Building Deputies [Please distribute].
FR: Physical Facilities
DA: Wednesday, April 23, 2008
RE: Discovery
Park fence relocation
The Discovery Park Site Development Phase VI fence location will be relocated sometime the week of April 28, 2008 and will remain at this location until mid-August 2008. This will affect the pedestrian traffic in the Discovery Park area, as well as entrances at both Bindley Bioscience and Mann Hall. Please see the site plan below showing the fence location in red.
The east door at Bindley will not be accessible from the north. All doors at Mann Hall will only be accessible from a southern route. The yellow sidewalks shown on the attached site plan will be available for use. Also, the sidewalk currently running between Mann Hall and Burton Morgan will be closed during this time period.
The
site plan drawing is available here: http://www.purdue.edu/physicalfacilities/pdf/disc_park.pdf.
A
map of the area is available here: http://www.purdue.edu/physicalfacilities/pdf/disc_park_map.pdf
Communications Announcement
Purdue University - Physical Facilities
TO: Building Deputies [Please distribute].
FR: Physical Facilities High Voltage Project
DA: Thursday, April 17, 2008
RE: Upcoming road closure and summer construction at
Wetherill
Beginning next week, crews will be pulling high voltage cable from the North Power Plant under Central Drive to Wetherill Hall. These cables will power the temporary substations that will be placed at the northwest corner of WTHR during the High Voltage Project.
During the latter part of next week, Central Drive will be closed for one day to allow crews to install the cable in the tunnel that runs under the road. Signs will be posted and an announcement will be made when the exact date has been determined (either Wednesday, Thursday, or Friday.) Vehicles that park in the HPN/ENAD lot will need to access it from the north side.
The High Voltage Project's vault expansion and equipment upgrades at Wetherill are expected to last from May 12 through August 15, 2008. During that time, the area between WTHR and the North Power Plant will be fenced off for the contractor lay down area. A walkway on the south side of HPN is expected to be maintained. The temporary substations will be in a fenced off area on the northwest side of WTHR, near the bike racks and adjacent to Centennial Mall. Central Drive will be closed for much of this project.
A map of the area is available here: http://www.purdue.edu/physicalfacilities/pdf/wthr.pdf (The road closure is marked in red; fenced areas are marked in blue.) Photos of the area are available on the High Voltage Project website located at: http://www.purdue.edu/physicalfacilities/HVP/wetherill.php
Communications Announcement
Purdue University - Physical Facilities
TO: Building Deputies [Please distribute and post the
attached cleaning schedule.]
FR: Parking Services
DA: Wednesday, April 16, 2008
RE: Parking Garage Summer Cleaning Schedule
The following is the summer parking garage cleaning schedule. Building Services will clean the
buildings from 10:30 p.m. to 7:00 a.m.
June 1 – June 10 ......... Grant Street Garage
June 11 – June 19 ....... University Street Garage (north half)
June 22 – July 3........... University Street Garage (south half)
July 6 – July 18............ Northwestern Street Garage (north half)
July 20 – July 29 .......... Northwestern Street Garage (south half)
July 30 – August 3 ....... Marsteller Street Garage
Note:
• The Grant Street Garage will remain open. It will be cleaned one half at a time starting with the top three levels.
• The Wood Street Garage will be closed all summer for major repairs and cleaned by the contractor.
• The Marsteller Garage will also have repair work done and the contractor will coordinate with Vivian Scott.
Communications Announcement
Purdue University - Physical Facilities
TO: Building Deputies [Please distribute.]
FR: Physical Facilities
DA: Friday, April 11, 2008
RE: Campus Disruptions and Closures
The Wood Street Parking Garage will be closed from May 12 through August 3,
2008, for repairs. Please contact Holly Alexander, Parking Manager, if you have
any questions at haalexander@purdue.edu
or 494-9315.
There will be no parking just
north of Harrison Hall from May 12 through August 1, 2008, for the Harrison
Hall Site Development Project.
Communications
Announcement
Purdue University - Physical Facilities
TO: Building Deputies [Please distribute.]
FR: Physical Facilities
DA: Monday, March 24, 2008
RE: Parking and Traffic Pattern Disruptions Near Purdue Airport
Effective Thursday, March 27, 2008 to August 1, 2008, parking and traffic
patterns will be disrupted near the Purdue
Airport due to
construction of the Niswonger Aviation Technology addition.
- The service drive from Airport
Road to the Aviation Technology
Building and Aerospace
Science and Composite Labs will be closed to thru traffic. Access to these
buildings for staff, students, vendors, and construction site traffic will be
available from South Russell Drive.
- Parking will be eliminated to the east of the terminal building and to the
south of the railroad tracks. A few parking spaces will be available across
from the Flight Operations Building
for Budget Rent-A-Car and Truck customers and across from the Aerospace Science
Lab. These spaces may be unavailable at times.
- CityBus service will be relocated to the front entrance of the Terminal Building.
- The north entrance into the Aviation Technology building will be open to foot
traffic.
A map of the area is available here: http://www.purdue.edu/physicalfacilities/travel/pdf/niswonger_aviation.pdf
Communications Announcement
Purdue University - Physical Facilities
TO: Building Deputies [Please distribute].
FR: Physical Facilities Construction
DA: Tuesday, March 11, 2008
RE: Stadium Mall Dr. to Close
Stadium Mall Drive will be closed beginning March 17, 2008 until August 1, for the Stadium Mall Gateway project. Pedestrians will not be able to walk on the main drive at the northwest end of the Mall, although the sidewalks will remain open. Vehicles will only be able to access the Mall from the south, and the west entrance of Armstrong will be inaccessible to vehicles.
A map of the area is available on the Campus Construction website: http://www.purdue.edu/physicalfacilities/campusconstruction/spring_map.htm. See project #9.